# Agile Coretime coming to Kusama

**URL:** <https://forum.polkadot.network/t/agile-coretime-coming-to-kusama/6638>\
**Category:** Ecosystem\
**Created:** [March 8, 2024, 11:20am UTC](https://forum.polkadot.network/t/agile-coretime-coming-to-kusama/6638 "2024-03-08T11:20:42Z")\
**Posts on this page:** 1\
**Showing post:** 12

<div class="post-metadata">

**Author:** ![santi](https://dub1.discourse-cdn.com/flex005/user_avatar/forum.polkadot.network/santi/32/127_2.png) [@santi](https://forum.polkadot.network/u/santi)\
**Post date:** [April 5, 2024, 4:20pm UTC](https://forum.polkadot.network/t/agile-coretime-coming-to-kusama/6638/12 "2024-04-05T16:20:32Z")

</div>

Following up on this, and preparing for the release of coretime, I prepared a tool so that each team would know, when things are fully migrated, what they can expected. This assumes that sales start at block 22\_793\_600, which is in line with the [referenda that was submitted yesterday](https://kusama.subsquare.io/referenda/375).

Repo is here: [GitHub - SBalaguer/coretime-migration: Tracking of coreitme expectations for Parachains.](https://github.com/SBalaguer/coretime-migration)

## Output

The output of the tool looks something like this:

```auto
{
    paraID: 2084,
    name: 'Calamari',
    coreUntilBlock: 23160700,
    renewCoreAtSaleNumber: 1
},

```

Each paraID that has a slot on Kusama and/or Polkadot will be represented in this list. The output shows until which block the paraID has a core (`coreUntilBlock`) and at which coretime sale the paraID has to renew its core.

In this case, paraID 2084 will have a core until block 23\_160\_700, however will have to renew this core during sale cycle 1.

**Renewal**

It’s important to point out that with the current configuration, every team that has LP37 as a last LP will have the chance to **renew their core** , they won’t need to buy a new one on the open market. This means that during the first “renewal” period of the coretime sale cycle (which is `interlude_length` long), these team will have a chance to just renew their core.

 ![image](https://europe1.discourse-cdn.com/flex005/uploads/polkadot2/original/2X/c/c36a7c6f93a87c8248c632960ac839a31e678df6.jpeg)

## Teams that need to pay attention

Teams that have LP37 as their last LP and will have to renew their core, are:

- paraID: 2084 → Calamari
- paraID: 2124 → Amplitude
- paraID: 2092 → Kintsugi
- paraID: 2015 → Integritee
- paraID: 2087 → Picasso
- paraID: 2088 → Altair

_Note: this does not consider the ongoing auction that has Integritee going against paraID 3347_

---

_[View the full topic](https://forum.polkadot.network/t/agile-coretime-coming-to-kusama/6638)._
